Nikko Hotel Bali Benoa Beach
Company
PT Caterison Sukses
Location
Bali
Project Completion
1996

Floor Area
49.500 m2
Floors
400
Hotel Nikko Bali, now known as Hilton Hotel, stands as a remarkable engineering feat completed by Wijaya Kusuma Contractors in 1996. The project, which includes a five-star hotel with 407 room keys spread across two hectares, also involved the ambitious task of carving into a cliff to accommodate a stunning 15-story tower. This engineering marvel required meticulous planning, precise execution, and advanced construction techniques to ensure both the stability of the cliff and the safety of the structure. The cliffside location presented unique challenges, including managing the environmental impact while maintaining the integrity of the natural landscape.
Undertaking such a complex project demanded exceptional structural solutions to ensure the tower’s long-term stability against the forces of nature, including wind and seismic activities common in Bali. WKC’s ability to deliver this level of precision in construction demonstrates their expertise in handling large-scale, high-risk developments. The successful integration of the 15-story tower into the cliff not only created a breathtaking architectural landmark but also reinforced WKC’s reputation for executing engineering marvels that push the boundaries of construction in Indonesia’s hospitality industry. This project stands as a testament to WKC’s dedication to delivering excellence in even the most challenging environments.